Name: | Copper Rod Making Machine | Material: | Copper |
---|---|---|---|
Cooling Method: | Water Cooling | Warranty: | 1 Year |
Processing Type: | Continuous Casting And Rolling | Condition: | New |
Power Source: | Electricity | Voltage: | 380V/50Hz |
Highlight: | High Efficiency Copper Rod Making Machine,Copper Rod Making Machine 0.3Mpa |
High-Efficiency Copper Rod Making Machine With Power Source Electricity
Brass rod making machines are used to produce brass rods of various sizes and specifications. These machines are designed to melt brass scraps or raw brass material and then transform the molten brass into solid rods through a series of processes.
Melting: Brass scraps or raw brass material are melted in a furnace or other heating equipment. The temperature is carefully controlled to ensure the brass is properly melted.
Drawing: In the drawen process, the brass is forced through a die to shape it into a rod with the desired diameter and length. This process helps improve the mechanical properties and surface finish of the brass rod.
Cooling and Cutting: the brass rod is cooled using a water system.After cooled, the rod is cut into the desired lengths using a cutting machine.
Finishing: The cut brass rods may undergo additional processes such as straightening, peeling, or surface treatment to meet specific requirements.
SL | SPECIFICATION | |
1 | Melting Rate | 500kg/h |
2 | Chamber Capacity | 2 |
3 | Temperature Rating | 1000-1100℃ |
4 | Total Rated Capacity Of Melting Furance | 3000kg |
5 | Total Rated Capacity Of Holding Furance | 40000kg |
6 | Voltage | 380V,50HZ |
7 | Cos After Compensation | 0.95-1 |
8 | Cooling Water Consumption | 10m³/h |
9 | Water Pressure | 0.3-0.4Mpa |
10 | Total Power | 250Kw |
We provide professional installation and commissioning services for Copper Rod Making Machine. Our experienced technicians will provide on-site guidance and installation services to ensure that the equipment is installed correctly and meets the customer's requirements.
We provide professional training services. Our experienced technicians will provide on-site operation and maintenance training to ensure that customers can operate the equipment correctly and safely.
We provide professional maintenance and repair services. Our experienced technicians will provide on-site maintenance and repair services to ensure that the equipment is running properly and efficiently.
We provide professional spare parts supply services. Our experienced technicians will provide a complete list of spare parts for customers to ensure that customers have enough spare parts for maintenance and repair.
1.COULD YOU ARRANGE THE ENGINEER FOR INSTALLATION AND COMMISSIONING?
A:Obviously yes,but the buyer pay the charges.
2.HOW TO CHOOSE ROD MAKING MACHINE?
A:It depends on your daily/monthly production required.(Contact us for the details)
3.DO YOU PROVIDE ANY SPARE PARTS WITH THE MACHINE?
A:Yes,we will provide some common parts for you according to our packing list(cotact us for packing list)
4.WHAT IS THE DELIVERY PERIOD AFTER PLACING THE ORDER?
A:Normally 15-20days after deposit..
5.WHAT IS THE WARRANTY PERIOD AND AFTER-SERVICE FOR YOUR MACHINE?
A:1 year warranty for components and life-long technical supports(details depends on the warranty rules)